In the Galvany neighborhood, Sarrià Sant Gervasi district, surrounded by facilities (schools, hospitals, services) and a wide variety of local businesses, cultural and gastronomic offerings and well connected by Generalitat Railways and buses, this Complex is located in construction, which will be delivered in June 2025.
It consists of 23 homes with 3 and 4 bedrooms, all of them double, with 2 bathrooms, one of them en suite, a toilet, an equipped kitchen and large terraces in each home. They have been designed to take advantage of all possible natural light.
Quality finishes; aerothermal energy, underfloor heating, home automation, equipped kitchen, LED lighting, optimal acoustic and thermal insulation.
It has a solarium and community pools, it has parking spaces with pre-installation of electric charging and storage rooms.
This house is the typical 3-bedroom floor plan, located on the first floor of the complex. It consists of 3 rooms: 1 double en suite, 1 double, 1 single. 2 full bathrooms, spacious living room with access to a covered east-facing terrace and an open south-facing terrace, kitchen equipped with high-end appliances. Swimming pool and solarium on the roof and parking and storage rooms available (not included in the price).
DELIVERY IN JUNE 2025